Actions
  • Title
    File relating to Torness Power Station Auto Control
  • Reference
    2023-585/1/1/1
  • Production date
    01-01-1985 - 31-12-1988
  • Creator
    • Schumm, James BarryBiography
    • Ferranti International plcBiography
  • Scope and Content
    Working documents of James Barry Schumm produced in the closing stages of the Torness Power Station group of contracts, in particular the Auto Control. It contains a mix of handwritten and printed documents comprising: site reports, diagrams, draft design information, meeting notes, fault reports and fault finding procedures OSC245 (P66425001 Issue 2, November 1984) along with correspondence between Ferranti, S.S.E.B. and N.N.C. The file was formerly attached by bulldog clip to the cover of a Ferranti branded lever arch file containing the items catalogued as 2023-585/1/1/2.
  • Physical description
    Generally good condition. Some documents have slight curling. All grouped sets of notes were stapled, or attached with treasury tags, some loose items were contained with the groups sets. Staples have been removed and replaced with brass paperclips, loose items secured. Some marks present where previous steel paperclips and staples have rusted.
  • Language
    English
  • Level of description
    ITEM
  • Repository name
    Science and Industry Museum
  • Conditions governing access
    Open access
  • Conditions governing Reproduction
    Copies may be supplied in accordance with current copyright legislation and Science Museum Group terms and conditions.
  • Related object