- Malines & Terneuzen RailwayBiographyBiography
Belgian Railway, active in 1871.
- Greenfield & Co.BiographyBiography
British building contractor which mainly carried out works on harbours.
- Isle of Wight Railway CoBiographyBiography
Railway incorporated in 1860, opening in 1864. The railway was absorbed into Southern Railway in 1923
- Dutch State RailwayBiographyBiography
Dutch railway company
- Maryport & Carlisle Railway CoBiographyBiography
Railway incorporated in 1837 to connect Carlisle and Maryport. George Stephenson was the engineer of the line, which opened fully on February 10, 1845. It became part of the London, Midland and Scottish Railway in 1923.
- London and South Western Railway CompanyBiographyBiography
The London and South Western Railway Company (LSWR) opened their first line in stages in from London to Southampton in 1838 under the name London and Southampton Railway Company. A year later the company name was changed to the LSWR. By the early 1900s, the line had been extended and ran from London to Plymouth via Yeovil, Exeter and Southampton. Some of the branch lines of the LSWR, further into Southern counties, were in direct competition with the Great Western Railway Company and others were worked in partnership with other railway companies such as the Somerset and Dorset Joint Railway.
Nine Elms in London was the main depot of the LSWR, until Waterloo Station was opened by the company in 1848. Nine Elms became the goods depot for the London and South Western Railway Company and Waterloo became one of the biggest passenger stations in the country. The main LSWR engineering works was transferred from Nine Elms to Eastleigh by 1909.
Sir Herbert Walker was General Manager of the London and South Western Railway Company from 1912, when he instituted the third-rail electrification programme, and was appointed General Manager of the Southern Railway Company in 1923, until his retirement in 1937. There were a number of notable engineers attached to the LSWR including John Viret Gooch, brother of Sir Daniel Gooch who was Locomotive Superintendent from 1841 to 1850. Dugald Drummond was the Chief Mechanical Engineer from 1895 to 1912; he facilitated moving the Works from Nine Elms to Eastleigh and their subsequent expansion and modernisation. Alfred Szlumper, appointed Chief Engineer in 1914 was key to the expansion and redesign of Waterloo Station, completed by 1922
The LSWR began electrification of its suburban lines from Waterloo in 1913. The first section was opened in 1915, and almost all the other planned routes were opened before the First World War curtailed the project. The London and South Western Railway Company was very prominent in handling all types of traffic during the First World War, due to it’s position serving London and the ports on the South Coast.
The LSWR also had an ocean-going port at Southampton, which was a growing rival to Liverpool and Glasgow for transatlantic travel. The purchase of Southampton docks by the LSWR in 1892, alongside their expansion and modernisation, was organised by Sir Charles Scotter, the General Manager from 1885 to 1898. Scotter then became Chairmen of the Company from 1904 to 1910. The LSWR also ran steamer services from Southampton to the Channel Islands and France.
In 1923, the LSWR was grouped into the Southern Railway Company by the Railways Act of 1921.
- Berlin–Magdeburg RailwayBiographyBiography
Opened in 1838 as the Berlin-Potsdam Railway, and extended in 1846 to Magdeburg.
- Bergisch-Markisch Railway CompanyBiographyBiography
German railway company founded in 1843
- Karlskrona Vaxjo RailwayBiographyBiography
Railway in Sweden, in existence in 1873.
- Swedish Government RailwayBiographyBiography
Government agency created in 1887 with the task of managing all state-owned railway lines in Sweden.
- Egyptian State RailwaysBiographyBiography
In 1851 the Regent of Egypt and Sudan, Abbas I, contracted Robert Stephenson to build Egypt's first standard gauge railway. Construction began on the line in 1851 and in 1854 a section was opened from Alexandria to the village of Kafr El-Eiss. In 1856 the entire single track line was opened with 12 stations including the main stations of Cairo (constructed in 1855) and Alexandria (constructed in 1854). In 1919, the railways became entrusted to the Ministry of Communications and in 1953, Egypt became a republic and Egyptian State Railways changed to become Egyptian Republic Railways.
- North Eastern Railway CoBiographyBiography
The North Eastern Railway Company was formed in 1854 when the York, Newcastle and Berwick, York and North Midland, Leeds Northern, and Malton and Driffield Railways amalgamated. It acquired the West Hartlepool Railway in 1864, the Stockton and Darlington in 1865 and the Blyth and Tyne in 1874. As a result it almost had a monopoly in its area. Its area of operation covered the north east and north Yorkshire, and stretched from Berwick-on-Tweed south to Doncaster, with extensions into Westmorland and Cumberland and into Scotland. It exercised running powers over the North British line from Berwick to Edinburgh and a joint owner of the Forth Bridge. It was also a joint owner of the East Coast Joint Stock with the Great Northern and North British Railways.
Its main goods traffic was coal from the Northumberland and Durham coalfields. It was an early investor in electrification, initially to deal with a difficult approach to the docks but later extended to the Newcastle-upon-Tyne suburban area. It also electrified goods workings between Shildon and Middlesbrough and planned to electrify the York to Newcastle route (even building a prototype locomotive) but the first world war intervened and the work was not carried out.
The headquarters of the NER were in York where it also had its carriage works. The main works were at Shildon. Among its Chief Mechanical Engineers were Wilson Worsdell, Thomas Worsdell and Vincent Raven.
The NER became part of the London and North Eastern Railway under Grouping in 1923.