- TitleEnglish Electric Company test specifications
- ReferenceGEC/3/11/11
- Production date1950 - 1970
- English Electric Company LimitedBiographyBiographyThe English Electric Company was formed on 14th December 1918 and over the following year acquired Dick, Kerr & Company of Preston, Willans & Robinson of Rugby, the Phoenix Dynamo Manufacturing Company of Bradford, and Coventry Ordnance Works. After the First World War the various German owned Siemens works were distributed to different UK companies and in November 1919 English Electric acquired the Siemens Brothers Dynamo Works at Stafford, which became the company headquarters in 1931. Coventry Ordnance, primary output naval guns, did not feature in the gradual product rationalisation which took place between the First World and Second world Wars. Willans & Robinson’s Rugby works specialised in prime movers, steam, hydro and internal combustion, and their Stafford works on power station and distribution electrics, including transformers and large electric machines for applications such as mining and steel works. Dick Kerr & Company continued building equipment and vehicles for bus, tram and railway applications with the Phoenix Dynamo Manufacturing Company concentrating on medium and small electrical machines. Involvement with aircraft continued a small scale. By 1929 the company was in financial trouble and an American syndicate fronted by Lazard Bros. put in new capital. In 1930 Westinghouse of Pittsburgh entered into an agreement with the company for the exchange of technical information relating to steam turbines and electrical apparatus. This cooperation continued into the 1950s. 1930 saw the closure of Preston West works and the transfer of traction electrical design and manufacture to the Phoenix Dynamo Manufacturing works. The Westinghouse influence included top management changes with Sir H Mensforth becoming chairman and George Nelson managing director. Both had been with British Westinghouse at Trafford Park. The early 1930s saw a remarkable improvement in the company’s finances and domestic appliance manufacture was started at Bradford and Stafford. In 1936 they began production of diesel locomotives at Preston and were later involved in the production of the Deltic locomotive for British Rail, presaging the end of steam traction in the UK. Extensive shadow factory building for war production commenced in the late 1930’s, including at Preston East works and Salmesbury for aircraft production and at East Lancashire Road, Liverpool for D. Napier aero engines. A large variety of military equipment built during the war included thousands of Cromwell tanks from Stafford and over 3000 Handley Page Hampden and Halifax bombers from Preston and Salmesbury. After the war manufacture of smaller products from Bradford and Stafford moved to the large Liverpool works. This included electrical distribution transformers, switchgear, fuse gear, fractional horsepower motors and domestic appliances. Napier’s continued engine manufacture with the development of the ’Deltic’ diesel engine, mainly for marine applications. The nearby Netherton works took over the manufacture of large hydro-electric turbines and generators from Willans and Stafford. In 1942 English Electric acquired D. Napier & Son Ltd and Marconi in 1946. The company went on to extend their railway interests with the acquisition of the Vulcan Foundry and Robert Stephenson and Hawthorn Ltd in 1955. The company tried to take over The General Electric Company (GEC) in 1960 but failed. Traction manufacture, but not the offices, moved back to Preston East works and ‘K’, ‘RK’ and ‘V’ engine design and manufacture moved from Willans to Preston West works which was now also used for locomotive building. Kidsgrove works in Stafford made industrial controls and for a while was a major player in the UK computer industry, merging with Leo Computers and then into ICL. Train performance calculations were an early user of the mid-fifties ‘Deuce’ computer. Preston also became a major player in the aircraft industry taking over the wartime RAF/USAF base at Warton aerodrome - major design and manufacture contracts included Canberra bombers and Lightning fighters. Rationalisation in the 1960s resulted in English Electric Aviation becoming 40% of the new British Aircraft Corporation. In 1961 English Electric took over Dorman Diesels Ltd which in turn had acquired W. G. Bagnall Ltd. In 1966 English Electric Diesels merged with Ruston and Hornsby which already included Paxmans. This company eventually became GEC Diesels. Elliott Automation was acquired in 1967. The following year GEC took over English Electric, ending its independent existence.
- Scope and ContentThe box contains 11 test specifications for Swedish State Railways, Argentine State Railways, Sudan Government Railways, Tasmania Government Railways, Midland Railway of Western Australia, Portuguese Railways, Netherlands Railway Co Ltd and Ghana Railways.
- Extent1 box
- Level of descriptionFILE
- Repository nameNational Railway Museum, York
- Central Argentine Railway Company Ltd.BiographyBiographyThe Central Argentine Railway Company Ltd. (CAR) was established in 1863 by William Wheelwright. In 1862, Wheelwright obtained a concession with Thomas Brassey and George Wythes, from the Argentine government to construct a railway line from Rosario to Cordoba, originally granted to Jose Buschenthal (1802 -1870) in 1854. It was a British-owned, broad gauge (5’ 6”) company serving the Buenos Aires, Sante Fe, Tucuman, Santiago del Estero and Cordoba provinces of Argentina. By 1910, the company was considered one of the ‘Big Four’ British-owned, broad gauge railway companies in Argentina, alongside Pacific and Western, Buenos Aires and Great Southern. The Rosario –Cordoba line was the main broad gauge line constructed by Central Argentine Railways, extending from the eastern seaport of Rosario to Cordoba, started in 1863 and inaugurated on May 17th 1870. In 1870, President Sarmiento arranged a £6 million loan for Central Argentine Railway to extend this line north from Cordoba to Tucuman. In the Buenos Aires province there were three main suburban lines of Tigre West, Tigre East and Villa Ballester. The Retiro – Tigre West service was the first line in South America to be electrified on December 1st 1916, the units being supplied by British Thomson- Houston Company Ltd. The Tigre East and Villa Ballester lines were electrified in 1924, and 221 units were supplied by Metropolitan-Vickers Electrical Company Ltd. The Central Argentine Railway operated the fastest train in South America, known as the “Rapido”, running between Buenos Aires and Rosario from 1910. Central Argentine Railways transported timber from the north including goods such as railway sleepers and fence posts, and sugar from Tucuman. The company was a major grain carrier, transporting maize, wheat and linseed amongst others. CAR was the first to adopt gas lighting in trains, to provide sleeping cars and luxurious dining and restaurant cars, and to use block and pneumatic signalling. The main stations are Retiro, the Buenos Aires terminus, opened in August 1915; Cordoba opened in 1919; Campana opened in 1925. The company continued to function until 1948, when President Juan Peron nationalised the Argentine Railway, creating six state owned railway networks and Central Argentine Railways was incorporated into the Ferrocarril Mitre network.
- Sudan Government RailwaysBiographyBiographySudan Railways is the main railway system in Sudan, operated by the government-owned Sudan Railways Corporation. It runs over 5000km of narrow gauge, single-track railroads that serve the northern and central parts of the country. The main line underwent construction in 1875, completed in 1899, and runs from Wadi Halfa to Khartoum, and southwest to Al Ubayyid via Sannar and Kosti. In 1904-5 a line between Swakin and Atbara was constructed with the two lines meeting at Saloom station, to facilitate export and import transportation. In 1906 the railway headquarters and workshops were moved from Wadi Halfa to Atbara, and since 1981 the company headquarters have been based in Khartoum. In the 1980’s Sudan Railways declined due to political instability and debt, with lines operating at only 20% capacity by 1989. In 2011-2012 a contract was signed to build a line from Nyala to Chad, extending to the capital of Chad, N’Djamena. In 2015 Sudan Railways had 60 trains available but which could only travel at 40km per hour due to poor track conditions, with President Omer Hassan al-Bashir promising modernisation of the Sudanese railways with Chinese funding.
- Tasmanian Government RailwaysBiographyBiographyTasmanian Government Railways (TGR) was formed in 1872 after it began to take over failing privately owned railway lines with its headquarters in Launceton, Tasmania. TGR owned lines ranging from Deloraine, the North West Coast, Hobart and Launceton to Antill Ponds and Turnbridge. In 1978 TGR was amalgamated with the Commonwealth Railways, South Australian Railways to form the new Australian National Railways Commission, operating as Tasrail.
- Ghana Railways and HarboursBiographyBiographyGhana Railways and Harbours Company began in 1928 as a state-owned company which maintained the country’s railways and the port of Takoradi. In 1957, Gold Coast Railway became Ghana Railway after Ghana became an independent nation from the United Kingdom. In 1972, the company was divided into four separate public organisations: Ghana Railway Company (GRC), Ghana Port Authority (GPA), Ghana Cargo Handling Company (GCHC), Takoradi Lighterage Company (TLC).
- Subject
Creator
Associated people and organisations
Hierarchy browser
- contains 4 partsTOPGEC GEC Traction Archive
- contains 11 partsSUB-FONDSGEC/3 Engineering records
- contains 18 partsSERIESGEC/3/11 Test specifications