- TitleSudan Railways, Nyasaland Railways, Empresa Municipal de Transportes (Madrid), Husky Stock Administration, Wilfred Marley Ltd and Post Office Railways order files
- ReferenceGEC/3/4/1
- Production date1957 - 1967
- English Electric Company LimitedBiographyBiographyThe English Electric Company was formed on 14th December 1918 and over the following year acquired Dick, Kerr & Company of Preston, Willans & Robinson of Rugby, the Phoenix Dynamo Manufacturing Company of Bradford, and Coventry Ordnance Works. After the First World War the various German owned Siemens works were distributed to different UK companies and in November 1919 English Electric acquired the Siemens Brothers Dynamo Works at Stafford, which became the company headquarters in 1931. Coventry Ordnance, primary output naval guns, did not feature in the gradual product rationalisation which took place between the First World and Second world Wars. Willans & Robinson’s Rugby works specialised in prime movers, steam, hydro and internal combustion, and their Stafford works on power station and distribution electrics, including transformers and large electric machines for applications such as mining and steel works. Dick Kerr & Company continued building equipment and vehicles for bus, tram and railway applications with the Phoenix Dynamo Manufacturing Company concentrating on medium and small electrical machines. Involvement with aircraft continued a small scale. By 1929 the company was in financial trouble and an American syndicate fronted by Lazard Bros. put in new capital. In 1930 Westinghouse of Pittsburgh entered into an agreement with the company for the exchange of technical information relating to steam turbines and electrical apparatus. This cooperation continued into the 1950s. 1930 saw the closure of Preston West works and the transfer of traction electrical design and manufacture to the Phoenix Dynamo Manufacturing works. The Westinghouse influence included top management changes with Sir H Mensforth becoming chairman and George Nelson managing director. Both had been with British Westinghouse at Trafford Park. The early 1930s saw a remarkable improvement in the company’s finances and domestic appliance manufacture was started at Bradford and Stafford. In 1936 they began production of diesel locomotives at Preston and were later involved in the production of the Deltic locomotive for British Rail, presaging the end of steam traction in the UK. Extensive shadow factory building for war production commenced in the late 1930’s, including at Preston East works and Salmesbury for aircraft production and at East Lancashire Road, Liverpool for D. Napier aero engines. A large variety of military equipment built during the war included thousands of Cromwell tanks from Stafford and over 3000 Handley Page Hampden and Halifax bombers from Preston and Salmesbury. After the war manufacture of smaller products from Bradford and Stafford moved to the large Liverpool works. This included electrical distribution transformers, switchgear, fuse gear, fractional horsepower motors and domestic appliances. Napier’s continued engine manufacture with the development of the ’Deltic’ diesel engine, mainly for marine applications. The nearby Netherton works took over the manufacture of large hydro-electric turbines and generators from Willans and Stafford. In 1942 English Electric acquired D. Napier & Son Ltd and Marconi in 1946. The company went on to extend their railway interests with the acquisition of the Vulcan Foundry and Robert Stephenson and Hawthorn Ltd in 1955. The company tried to take over The General Electric Company (GEC) in 1960 but failed. Traction manufacture, but not the offices, moved back to Preston East works and ‘K’, ‘RK’ and ‘V’ engine design and manufacture moved from Willans to Preston West works which was now also used for locomotive building. Kidsgrove works in Stafford made industrial controls and for a while was a major player in the UK computer industry, merging with Leo Computers and then into ICL. Train performance calculations were an early user of the mid-fifties ‘Deuce’ computer. Preston also became a major player in the aircraft industry taking over the wartime RAF/USAF base at Warton aerodrome - major design and manufacture contracts included Canberra bombers and Lightning fighters. Rationalisation in the 1960s resulted in English Electric Aviation becoming 40% of the new British Aircraft Corporation. In 1961 English Electric took over Dorman Diesels Ltd which in turn had acquired W. G. Bagnall Ltd. In 1966 English Electric Diesels merged with Ruston and Hornsby which already included Paxmans. This company eventually became GEC Diesels. Elliott Automation was acquired in 1967. The following year GEC took over English Electric, ending its independent existence.
- Scope and ContentThe box contains 7 order files for Sudan Railways, Nyasaland Railways, Empresa Municipal de Transportes (Madrid), Husky Stock Administration, Wilfred Marley Ltd and Post Office Railways.
- Extent1 box
- Level of descriptionFILE
- Repository nameNational Railway Museum, York
- Robert Stephenson & Hawthorns LtdBiographyBiographyIn 1937 Robert Stephenson & Co. Ltd purchased the locomotive department of R & W Hawthorn Leslie & Co. Ltd. They became Robert Stephenson and Hawthorns Ltd. The policy was to concentrate the building of main line locomotives at Robert Stephenson’s Darlington works and industrial locomotives at Forth Banks. In 1944 Vulcan Foundry acquired Robert Stephenson and Hawthorns Ltd, ending Hawthorns' 137 year connection with Forth Banks. In 1955 Vulcan Foundry became full members of the English Electric group of companies, which became part of the GEC group of companies in 1968.
- Sudan Government RailwaysBiographyBiographySudan Railways is the main railway system in Sudan, operated by the government-owned Sudan Railways Corporation. It runs over 5000km of narrow gauge, single-track railroads that serve the northern and central parts of the country. The main line underwent construction in 1875, completed in 1899, and runs from Wadi Halfa to Khartoum, and southwest to Al Ubayyid via Sannar and Kosti. In 1904-5 a line between Swakin and Atbara was constructed with the two lines meeting at Saloom station, to facilitate export and import transportation. In 1906 the railway headquarters and workshops were moved from Wadi Halfa to Atbara, and since 1981 the company headquarters have been based in Khartoum. In the 1980’s Sudan Railways declined due to political instability and debt, with lines operating at only 20% capacity by 1989. In 2011-2012 a contract was signed to build a line from Nyala to Chad, extending to the capital of Chad, N’Djamena. In 2015 Sudan Railways had 60 trains available but which could only travel at 40km per hour due to poor track conditions, with President Omer Hassan al-Bashir promising modernisation of the Sudanese railways with Chinese funding.
- Post Office, (London) RailwayBiographyBiographyThe Post Office first showed an interest in using underground railways to transport mail beneath London in 1854 and in 1893 serious consideration was given to running an electric railway in the pneumatic tunnels. By the turn of the twentieth century, traffic congestion in London had reached the point that cross-London journeys by road took so long that an unnecessary number of vehicles had to be used to carry the ever growing volume of mails between sorting offices and main line termini. In 1905, the Metropolitan Pneumatic Despatch Co presented a bill to Parliament for the construction of a pneumatic line connecting the major railway termini and Post Offices. The Bill was rejected as being too ambitious. In September 1909 the Postmaster General appointed a Committee to examine the practicality of the transmission of mails in London by pneumatic tube or electric railway. The Committee reported in February 1911 in favour of an electric railway between Paddington Station (Great Western Railway) and the Eastern District Post Office in Whitechapel Road, a distance of six and a half miles. The scheme was submitted by the Postmaster General to the Cabinet in 1912 and power to construct the railway was given to the Postmaster General by the Post Office (London) Railway Act, 1913. The Act made provision for compensation for damage and allowed the Post Office a budget of £1, 100, 00 to construct the line with stations at Paddington, Western District Office, Western Parcel Office, West Central District Office, Mount Pleasant Sorting Office, King Edward Building, Liverpool Street and East District Office. Tenders for the construction of the tunnel were invited on the 26 August 1914. John Mowland and Co won the tender to construct the tunnels and build eight stations. The work, although interrupted by the war was completed in 1917. In parallel with the building work, Post Office engineers built a test tract on Plumstead Marshes to experiment with the control systems and rolling stock. However, the war caused the testing to be brought to a premature halt. During the war the stations became a home for exhibits from museums. The cessation of the war enabled the Post Office to proceed with their plans, and in 1919 tenders were issued for the supply and installation of the electrical equipment. Prices proved too expensive for the post war budget and the scheme was held in abeyance until 1923 when tenders were reissued. In May 1927, work was sufficiently advanced for half the system to be handed over for staff training and in December of that year the scheme received Parliamentary approval and the line became fully operational with parcels traffic running between Mount Pleasant and Paddington. Mount Pleasant to Liverpool Street opened for Christmas parcels from 19th-24th December and then for a full parcels service from 28 December. Liverpool Street to Eastern District Office opened for parcels on 2 January 1928. Letter traffic began on 13 February with the opening of West Central District Office station, followed by Western District Office on 12 March. The line proved an immense benefit to the Post Office in the first year of operation, however the high mileage gave the Post Office problems as the cars needed a lot of maintenance. In the early 1930s the rolling stock underwent a gradual change as the cars were replaced by three car trains. These trains were replaced by 34 new trains in 1981 in a £1 million development programme. In a Press Release, issued by the Post Office PR team on 7 November 2002, Royal Mail announced that unless it could find a new backer, that the Post Office underground railway would close in the near future. The working operation finally ceased on 30 May 2003, but the system has in fact been 'mothballed' in the hope that an alternative use can be found for it.
- British Timken LtdBiographyBiographyAmerican firm Timken created the subsidiary company British Timken in 1937 situated in Birmingham. The company were makers of tapered roller, parallel roller and ball bearings. In 1941 works were built at Duston in Northampton to produce roller bearings for the automotive industry, exporting up to 70% of its production to Continental Europe. In 2002 the Duston factory was closed with production moving to Poland.
- Subject
Creator
Associated people and organisations
Hierarchy browser
- contains 4 partsTOPGEC GEC Traction Archive