Title
Gold Coast Railway 4-8-2 superheated tender engines mechanical parts
Reference
GEC/2/2/5/14
Production date
1939 - 1939
Creator
- Vulcan Foundry LtdBiographyBiography
The Vulcan Foundry was originally opened in 1830 at Newton-le-Willows, as Charles Tayleur and Company. It initially produced girders for bridges, switches and crossings, and other ironwork following the opening of the Liverpool and Manchester Railway. Robert Stephenson became a partner in 1832, and in the same year, the first locomotives ‘Tayleur’ and ‘Stephenson’ were delivered to the North Union Railway. By 1840 locomotives had been delivered to five European countries and to North America. The company became The Vulcan Foundry Company in 1847 and acquired limited liability in 1864. From the beginning of 1898, the name changed again to The Vulcan Foundry Limited, dropping the word 'company.' Vulcan locomotives were exported all over the world, with the first locomotives for Russia and Japan supplied in 1837 and 1871 respectively and a long association with India began in 1852.
First World War production included shells, gun mountings and mine sweeping equipment. The first non-steam locomotive, an electric, was produced for India in 1929. The first diesel locomotive design commenced in 1932/33 and an agreement was reached with A/S Frichs in Denmark. The English Electric 6K engine was used from this time. The “Waltzing Matilda” tank was developed in 1938 and produced in large numbers and over five hundred ‘Austerity’ steam locomotives were produced for the War Department. Other wartime production included gun mountings and torpedo parts. In 1944 Vulcan acquired the locomotive business, Robert Stephenson & Hawthorns Ltd, based in Newcastle-upon-Tyne.
In 1946 the company began working with the English Electric Company producing diesel and electric locomotives and became part of the English Electric Group in 1955. All locomotive building from Preston was transferred to Vulcan Foundry and Robert Stephenson’s in Darlington. Under the new ownership, the works produced many locomotives for both domestic and foreign railways, notably the Deltic. The mid-sixties saw the ‘RK’/’V’ engine production at Preston moved to Vulcan and Ruston & Hornsby Ltd merged with English Electric Diesels in 1966. After the General Electric Company plc (GEC) takeover in 1968 the Ruston name was used for some time inside what became GEC Diesels Ltd in 1975. Engine production and development continued for locomotive, industrial and marine applications until after the GEC-Alsthom merger in 1989. The company took over Mirlees Engines, Stockport in 1997 and was renamed Alstom Engines Ltd.
Scope and Content
The roll contains c 50 waxed linen drawings of Gold Coast Railway 4-8-2 superheated tender engines mechanical parts. Drawing numbers Z6297; Z9025.
Extent
1 roll
Archival history
This roll of drawings was compiled by Vulcan Foundry Ltd
Level of description
FILE
Repository name
National Railway Museum, York
Associated people and organisations
- Gold Coast Government RailwayBiographyBiography
The construction of the Gold Coast Government Railway began in the Sekondi district in 1898, but protests to the Colonial Office, a shortage of labour and the breakout of the final Ashanti war meant progress was slow until 1900. The railway reached Tarkwa in 1901, Obuasi in 1902 and in 1903 Ashanti. In 1912 a line connecting the colony’s capital, and government seat, of Accra with Kumasi was commenced and completed in 1923, making the railway 362 miles. In 1928, Takoradi Harbour was opened which enabled the exportation of mangoase, mahogany, cocoa and timber brought by the railway from the interior of the Gold Coast Colony.
With the exception of 39 mile journey between Accra and Mangoase, which was privately contracted, the whole Gold Coast Railway was built by government departments. The company headquarters were in Sekondi initially, but then moved to Takoradi in 1928 after the construction of the harbour. The railway was built using 16,000 native Africans, 12,000 of whom were Nigerian, after the Gold Coast government appealed to neighbouring colonies for labour, in addition the locomotives and rolling stock were imported. The main stations were Accra, Mangoase, Sekondi, Tarkwa, Obuasi, Takoradi and Kumasi. The workshops were situated two miles from Sekondi, though repairs were also carried out at Accra. In 1957, Gold Coast Railway became Ghana Railway after Ghana became an independent nation from the United Kingdom.
Subject
Related object