- TitleClass 91 wheel issues and modifications and other mechanical details
- ReferenceGEC/2/2/1/49
- Production date1986 - 1986
- GEC Traction LimitedBiographyBiographyGEC Traction (GECT) was formed in 1972 as part of the GEC Power Engineering Group following earlier amalgamations of the traction divisions of the General Electric Company (GEC), the English Electric Company (EE) and Associated Electrical Industries (AEI). A wholly owned subsidiary company of GEC, the company had offices and works, located at Trafford Park in Manchester, at Strand Road in Preston, and at Attercliffe Common, Sheffield. The headquarters of GEC Traction was Trafford Park, Manchester (previously the headquarters of English Electric-AEI Traction) with design of rotating machines at Preston and Sheffield, and manufacturing activities for control equipment at Manchester and Preston. GEC Traction designed and manufactured a full range of traction machines and control equipment for electric vehicles, including electric locomotives and multiple unit trains for main-line and mass-transit railway systems (dc up to 3,000 volts, and ac up to 50,000 volts), diesel-electric locomotives and trains, mining and industrial locomotives, tramcars and trolleybuses. GEC Traction was the leading supplier of traction equipment in the UK and had a wide market around the world, particularly in South Africa, Australasia, Hong Kong, South Korea, South America and Pakistan. In 1979 the Industrial Locomotive Division of the former English Electric which was based at Vulcan Works, Newton-le-Willows was merged into GEC Traction, which later became a separate company, GEC Industrial Locomotives Ltd. During the late 1980s and 1990s the firm underwent major rationalisation, involving closure of several sites including Attercliffe Common in Sheffield in 1985 and the company’s headquarters at Trafford Park in Manchester in 1998. The company name GEC Traction endured until a merger with the French Alsthom group in 1989, which created GEC Alsthom Traction, which was still a branch of the main company GEC Alsthom.
- Scope and ContentThe roll contains c 50 acetate drawings of cabling details, Shanghai Metro typical underground station layout; GEC TPL BR Class 91 wheel issues and modifications; Maglev snow plough details and layouts of GEC Traction offices. Drawing number range TRS 1487 - 1552.
- Extent1 roll
- Archival historyThis roll of drawings was compiled by GEC Traction Limited
- Level of descriptionFILE
- Repository nameNational Railway Museum, York
- Trafford Park WorksBiographyBiographyIn 1900 the British Westinghouse Electrical & Manufacturing Co Ltd bought land in Trafford Park and built a factory which went into production in 1902 for the manufacture of mechanical and electrical equipment for the generation, transmission and use of electricity. In 1919, Trafford Park Works became owned by British Westinghouse’s successor, Metropolitan-Vickers Electrical Company (MV). The main shops, in common with factory construction throughout Trafford Park, were single floor type, with bays 1,000 feet in length, and had direct railway communication with the docks and trunk systems of the country. The main office block was a copy of the Westinghouse building in Pittsburgh, USA and the factory was to the American design and used imported steelwork for construction. Products manufactured at the Works included gas engines, stationary steam engines, electric generators, transformers, switchgear, meters, motors, control gear, and arc lamps. During the First World War, British Westinghouse built some small petrol-electric locomotives for the War Department Light Railways. In 1928 the Works were taken over by Associated Electrical Industries (AEI), which merged Metropolitan-Vickers and British Thomson-Houston, though these two companies continued their own trading names. Traction design and manufacture was always a minority of the workload at Trafford Park with the largest operations generally turbine manufacture. Very few vehicles were built there, and traction machines (i.e. motors, inductors and generators) were largely built in other places – notably at Sheffield or Rugby. Trafford Park traction manufacture was largely that of assembling control gear – contactors, switches, drivers’ controllers, camshaft controllers, relays etc. and building these into frames or equipment boxes for installation in vehicles made elsewhere. An important part of the Trafford Park Works site was the general switchgear operation, mainly for generation or distribution installations. The on-site Switchgear Testing Company was a “testing house” for these products and contributed to testing and development of traction circuit breakers and switchgear. During the Second World War MV acting for the Ministry of Aircraft Production produced more than a thousand Lancaster Bombers in the adjacent Mosley Road building. The company also manufactured war munitions and in the laboratories developed what became known as Radar. In 1959 the newly formed AEI Traction Division established its headquarters at Trafford Park, with a product range that included electric and diesel-electric locomotives; electrical equipment for tram-cars, trolley buses and trolley mining locomotives and traction motors. AEI was taken over by the General Electric Company (GEC) in 1967 whose Witton Works closed in 1969, with the design office and traction manufacture transferred to Trafford Park, as a result of the GEC reorganisation and mergers. GEC Traction Ltd took over the Works in 1972. In 1990 the former Low Voltage Switchgear site at Trafford Park (West Works) was renovated to be the new manufacturing facility for GEC Alsthom Traction, with an electronics workshop, machine shop and plating baths, and an assembly shop for switchgear, equipment cases and power modules. This building was vacated in 1998 when power modules and switchgear was moved to Tarbes in south west France. The Works housed the administrative, commercial and accounting functions, the majority of the design departments and the development section with its associated workshops and laboratories. The manufacturing area was devoted primarily to the production of components of traction control and railway signalling equipment. In 1993, as part of the rationalisation of the equipment group, it was announced that the headquarters of GEC Alsthom Traction would move to Preston, leaving only Power Module design and manufacture at Manchester, with the eventual closing of all activities at Trafford Park in 1998. The iconic original Westinghouse building was demolished and the site is now (2015) largely devoted to container handling and logistics operations.
- GEC Transportation Projects LtdBiographyBiographyGEC Transportation Projects Ltd., (GEC-TPL) was established in 1974 and was based at St Albans and Borehamwood, Hertfordshire. It specialised in the design, execution and management of major railway and mass transit electrification projects around the world. In 1981 GEC-TPL was transferred to Trafford Park in Manchester took over residual responsibility for vehicle design from GEC Traction, e.g. British Railways Class 91s and locomotive equipment design, e.g., British Railways Class 90s. GEC-TPL project managed 406 track kilometres of electrification in Taiwan in 1984. It involved the design, supply and installation of equipment including catenary, substations, telecommunications, locomotives and multiple units. The company also supplied the 134, 3-car trains and project managed the equipment of Lines 3 and 4 of Seoul Metropolitan Subway Corporation. Closer to home, GEC-TPL was the project management company for Phase 1 of the Docklands Light Railway and the Manchester ‘Metrolink’ and supplied the initial vehicles for both systems. In 1987, GEC-TPL contracted to supply the body mounted power equipment for the initial build of Trans Manche Super Trains, later known as ‘Eurostars’, the bar car mechanical parts for which were supplied by its long term partner Metropolitan Cammell which later became part of GEC-TPL in 1989. In 1989, GEC Transportation Projects Ltd became part of the joint company, GEC Alsthom Transportation Projects Ltd., when GEC and Alsthom of France, part of Compagnie Générale d’Electricité (CGE) formed GEC Alsthom. The combined company acquired Metropolitan Cammell at this time. (Alsthom’s name had earlier been derived from ‘Alsace Thomson-Houston’, thereby revealing its earlier parentage from Thomson-Houston of America, as also had the British Thomson-Houston Co., of Rugby, another GEC constituent). In 1998 the company formally changed its name to ALSTOM.
- British RailwaysBiographyBiography“British Railways” is the expression commonly used to describe the business run by the following legal entities: • Railway Executive (1948 – 1952) • British Transport Commission (1952 – 1963) • British Railways Board (1963 – 1993) Railways were nationalised on 1st January 1948 when the assets of the railways in Great Britain were vested in the British Transport Commission (BTC), a state-owned corporation created by the Transport Act 1947. Between 1948 and 1952 the business of operating the railways was carried on by the Railway Executive, a state-owned corporation, subsidiary to BTC. The Railway Executive was abolished in 1952 and BTC took over direct responsibility for the railways. Before 1948 there was no brand that was identified with the whole of the railways of Great Britain, only the separate brands of the Group companies, Southern, Great Western, London, Midland and Scottish and London and North Eastern, and London Transport. The railways were run under the corporate identity “British Railways” from 1948 by both the Railway Executive and BTC. The public manifestations of this were the words themselves on vehicles and premises, quasi-heraldic devices on locomotives (the so-called “cycling lion” followed by the “ferret and dartboard”) and the lozenge shape adopted (and clearly inspired by London Transport’s very similar logo) for station names. When the nationalised transport industry was reorganised in 1963, BTC was itself abolished and a new statutory corporation created to run the railways. This was British Railways Board (BRB). The name most closely associated with the national railway system had now become part of the name of the corporate entity, (i.e. the legal person, entitled as a matter of law to own property, to enter into contracts, and to sue (or be sued) in the courts and be prosecuted for breaches of the criminal law) which owned the assets and business of the railways of Great Britain. As a result of the corporate rebranding carried out in 1965 the business name, or brand name (as it was now expressly recognised to be), was shortened to “British Rail”. However, BRB retained the full “British Railways” in its title until its eventual abolition under the provisions of the Transport Act 2000.
- Subject
Creator
Associated people and organisations
Hierarchy browser
- contains 4 partsTOPGEC GEC Traction Archive
- contains 5 partsSUB-FONDSGEC/2 Drawing Office records
- contains 35 partsSERIESGEC/2/2 Drawings
- contains 96 partsSUB-SERIESGEC/2/2/1 GEC Traction Limited drawings