- 1Memorandum on the Performance of the 500 MW Feedheating and Condensing Cycle By G.W. Brown and P.H. Brazier. (YA1999.39/1/33)
May 1964, item - 2Departmental Engineering Report D.E.R. 101/63/4 for a visit to General Electric Co. Schenectady by A. Sidebotham and P.H. Brazier. (YA1999.39/2/36)
May 1963, item