- TitleBoiler & firebox plates
- ReferenceGEC/2/2/5/12
- Production date1937 - 1937
- Vulcan Foundry LtdBiographyBiographyThe Vulcan Foundry was originally opened in 1830 at Newton-le-Willows, as Charles Tayleur and Company. It initially produced girders for bridges, switches and crossings, and other ironwork following the opening of the Liverpool and Manchester Railway. Robert Stephenson became a partner in 1832, and in the same year, the first locomotives ‘Tayleur’ and ‘Stephenson’ were delivered to the North Union Railway. By 1840 locomotives had been delivered to five European countries and to North America. The company became The Vulcan Foundry Company in 1847 and acquired limited liability in 1864. From the beginning of 1898, the name changed again to The Vulcan Foundry Limited, dropping the word 'company.' Vulcan locomotives were exported all over the world, with the first locomotives for Russia and Japan supplied in 1837 and 1871 respectively and a long association with India began in 1852. First World War production included shells, gun mountings and mine sweeping equipment. The first non-steam locomotive, an electric, was produced for India in 1929. The first diesel locomotive design commenced in 1932/33 and an agreement was reached with A/S Frichs in Denmark. The English Electric 6K engine was used from this time. The “Waltzing Matilda” tank was developed in 1938 and produced in large numbers and over five hundred ‘Austerity’ steam locomotives were produced for the War Department. Other wartime production included gun mountings and torpedo parts. In 1944 Vulcan acquired the locomotive business, Robert Stephenson & Hawthorns Ltd, based in Newcastle-upon-Tyne. In 1946 the company began working with the English Electric Company producing diesel and electric locomotives and became part of the English Electric Group in 1955. All locomotive building from Preston was transferred to Vulcan Foundry and Robert Stephenson’s in Darlington. Under the new ownership, the works produced many locomotives for both domestic and foreign railways, notably the Deltic. The mid-sixties saw the ‘RK’/’V’ engine production at Preston moved to Vulcan and Ruston & Hornsby Ltd merged with English Electric Diesels in 1966. After the General Electric Company plc (GEC) takeover in 1968 the Ruston name was used for some time inside what became GEC Diesels Ltd in 1975. Engine production and development continued for locomotive, industrial and marine applications until after the GEC-Alsthom merger in 1989. The company took over Mirlees Engines, Stockport in 1997 and was renamed Alstom Engines Ltd.
- Scope and ContentThe roll contains one waxed linen drawing of Buenos Ayres Great Southern Railway boiler and firebox plates for a Class 15A locomotive. Drawing numbers I-4236; Y544; VF2239; VF2240.
- Extent1 roll
- Archival historyThis roll of drawings was compiled by Vulcan Foundry Ltd
- Level of descriptionFILE
- Repository nameNational Railway Museum, York
- Buenos Aires Great Southern RailwayBiographyBiographyIn 1861 Sir Edward Lumb, a British entrepreneur, requested a concession from the Legislature of the Province of Buenos Aires to build a railway line from Constitucion to Chascomus, 120km away from Buenos Aires, which was granted on June 12th 1862 by President Bartolome Mitre. In 1863, with the support of London shareholders Thomas Duguid, the Fair family, British consul Frank Parish (later Southern’s chairman), and bankers Baring and David Robertson, Buenos Aires Great Southern Railway Ltd. was established. The first general manager of the company was Edward Banfield, the Buenos Aires suburban station of Banfield was named after him when it opened in 1873. Buenos Aires Great Southern Railway had its company headquarters in London, and operated workshops and rolling stock depots in Barracas. The main stations of the Buenos Aires Great Southern Railway are Constitucion, Barracas al Sud, Jeppener, Chascomus, Barracas al Norte, Las Flores, Azul, Dolores and Banfield. In 1877 Buenos Aires Great Southern Railway built a new warehouse in Constitucion station for freight trains and a freight station at Sola in Buenos Aires where repair shops operated for 15 years. By 1884 Buenos Aires Great Southern Railway was the largest in Argentina, with 1,025km of track. In 1901 new workshops were built at Remedios de Escalada, 11km from Constitucion station, being the largest workshop in South America, employing 2700. In 1925, the company took over Bahia Blanca and North Western Railway from Buenos Aires and Pacific Railway Company. By 1930 Buenos Aires Great Southern Railway Company had 8000 km of track, 504 stations, 857 locomotives, 955 carriages, 16,602 coaches and 30,000 employees. The company continued to function until 1948, when President Juan Peron nationalised the Argentine Railway, creating six state owned railway networks. Buenos Aires Great Southern Railway was incorporated into the Ferrocarril General Roca network.
- SubjectRailway engineering
Manufacturing and transport engineering
locomotives
Exports
Creator
Associated people and organisations
Hierarchy browser