- TitlePhotograph album no. 18
- ReferenceEE/1/18
- Production date1918 - 1968
- English Electric Company LimitedBiographyBiographyThe English Electric Company was formed on 14th December 1918 and over the following year acquired Dick, Kerr & Company of Preston, Willans & Robinson of Rugby, the Phoenix Dynamo Manufacturing Company of Bradford, and Coventry Ordnance Works. After the First World War the various German owned Siemens works were distributed to different UK companies and in November 1919 English Electric acquired the Siemens Brothers Dynamo Works at Stafford, which became the company headquarters in 1931. Coventry Ordnance, primary output naval guns, did not feature in the gradual product rationalisation which took place between the First World and Second world Wars. Willans & Robinson’s Rugby works specialised in prime movers, steam, hydro and internal combustion, and their Stafford works on power station and distribution electrics, including transformers and large electric machines for applications such as mining and steel works. Dick Kerr & Company continued building equipment and vehicles for bus, tram and railway applications with the Phoenix Dynamo Manufacturing Company concentrating on medium and small electrical machines. Involvement with aircraft continued a small scale. By 1929 the company was in financial trouble and an American syndicate fronted by Lazard Bros. put in new capital. In 1930 Westinghouse of Pittsburgh entered into an agreement with the company for the exchange of technical information relating to steam turbines and electrical apparatus. This cooperation continued into the 1950s. 1930 saw the closure of Preston West works and the transfer of traction electrical design and manufacture to the Phoenix Dynamo Manufacturing works. The Westinghouse influence included top management changes with Sir H Mensforth becoming chairman and George Nelson managing director. Both had been with British Westinghouse at Trafford Park. The early 1930s saw a remarkable improvement in the company’s finances and domestic appliance manufacture was started at Bradford and Stafford. In 1936 they began production of diesel locomotives at Preston and were later involved in the production of the Deltic locomotive for British Rail, presaging the end of steam traction in the UK. Extensive shadow factory building for war production commenced in the late 1930’s, including at Preston East works and Salmesbury for aircraft production and at East Lancashire Road, Liverpool for D. Napier aero engines. A large variety of military equipment built during the war included thousands of Cromwell tanks from Stafford and over 3000 Handley Page Hampden and Halifax bombers from Preston and Salmesbury. After the war manufacture of smaller products from Bradford and Stafford moved to the large Liverpool works. This included electrical distribution transformers, switchgear, fuse gear, fractional horsepower motors and domestic appliances. Napier’s continued engine manufacture with the development of the ’Deltic’ diesel engine, mainly for marine applications. The nearby Netherton works took over the manufacture of large hydro-electric turbines and generators from Willans and Stafford. In 1942 English Electric acquired D. Napier & Son Ltd and Marconi in 1946. The company went on to extend their railway interests with the acquisition of the Vulcan Foundry and Robert Stephenson and Hawthorn Ltd in 1955. The company tried to take over The General Electric Company (GEC) in 1960 but failed. Traction manufacture, but not the offices, moved back to Preston East works and ‘K’, ‘RK’ and ‘V’ engine design and manufacture moved from Willans to Preston West works which was now also used for locomotive building. Kidsgrove works in Stafford made industrial controls and for a while was a major player in the UK computer industry, merging with Leo Computers and then into ICL. Train performance calculations were an early user of the mid-fifties ‘Deuce’ computer. Preston also became a major player in the aircraft industry taking over the wartime RAF/USAF base at Warton aerodrome - major design and manufacture contracts included Canberra bombers and Lightning fighters. Rationalisation in the 1960s resulted in English Electric Aviation becoming 40% of the new British Aircraft Corporation. In 1961 English Electric took over Dorman Diesels Ltd which in turn had acquired W. G. Bagnall Ltd. In 1966 English Electric Diesels merged with Ruston and Hornsby which already included Paxmans. This company eventually became GEC Diesels. Elliott Automation was acquired in 1967. The following year GEC took over English Electric, ending its independent existence.
- Scope and Content1 album containing photographs and brief descriptions of diesel electric traction equipment built by English Electric for railway companies across the world alongside pictures of locomotives being assembled at Preston Works.
- Extent1 Volume
- Level of descriptionITEM
- Repository nameNational Railway Museum, York
- Egyptian State RailwaysBiographyBiographyIn 1851 the Regent of Egypt and Sudan, Abbas I, contracted Robert Stephenson to build Egypt's first standard gauge railway. Construction began on the line in 1851 and in 1854 a section was opened from Alexandria to the village of Kafr El-Eiss. In 1856 the entire single track line was opened with 12 stations including the main stations of Cairo (constructed in 1855) and Alexandria (constructed in 1854). In 1919, the railways became entrusted to the Ministry of Communications and in 1953, Egypt became a republic and Egyptian State Railways changed to become Egyptian Republic Railways.
- Malayan Railways
- Netherlands Railway
- South Australian RailwaysBiographyBiographySouth Australian Railways (SAR) was the statutory corporation through which the Government of South Australia built and operated railways in South Australia from 1854. In March 1978, the non-urban railways were incorporated into Australian National, and the Adelaide urban lines were transferred to the State Transport Authority.
- San Sebastian-Pamplona Railway
- Sudan Government RailwaysBiographyBiographySudan Railways is the main railway system in Sudan, operated by the government-owned Sudan Railways Corporation. It runs over 5000km of narrow gauge, single-track railroads that serve the northern and central parts of the country. The main line underwent construction in 1875, completed in 1899, and runs from Wadi Halfa to Khartoum, and southwest to Al Ubayyid via Sannar and Kosti. In 1904-5 a line between Swakin and Atbara was constructed with the two lines meeting at Saloom station, to facilitate export and import transportation. In 1906 the railway headquarters and workshops were moved from Wadi Halfa to Atbara, and since 1981 the company headquarters have been based in Khartoum. In the 1980’s Sudan Railways declined due to political instability and debt, with lines operating at only 20% capacity by 1989. In 2011-2012 a contract was signed to build a line from Nyala to Chad, extending to the capital of Chad, N’Djamena. In 2015 Sudan Railways had 60 trains available but which could only travel at 40km per hour due to poor track conditions, with President Omer Hassan al-Bashir promising modernisation of the Sudanese railways with Chinese funding.
- British Railways BoardBiographyBiographyThe British Railways Board was an independent statutory corporation responsible for running the British railway network from 1963. It was established by the Transport Act 1962, which abolished the British Transport Commission and divided its undertakings between five newly-created bodies: the British Railways Board, the British Waterways Board, the British Transport Docks Board, the London Transport Board, and a Transport Holding Company. The British Railways Board was responsible for running the railway network, as well as managing government-owned railway hotels. Members of the British Railways Board were also appointed by the Minister for Transport. The first Chair of the British Railways Board was Dr Richard Beeching. The British Railways Board operated through regional boards, which were responsible for regional sections of the railway network. These regions were Southern, Western, London Midland, London and North Eastern, Eastern, and Scottish. Members of these regional boards were appointed by the British Railways Board, in consultation with the Minister for Transport. The British Railways Board also operated a series of committees to manage every aspect of railway control, including committees for finance, technical, works and property. These committees were frequently reorganised throughout the life of the British Railways Board, under both different Chairs of the Board and different governments. Several changes occurred during the 1960s. The Board had two new Chairs; Stanley Raymond, who replaced Richard Beeching in 1965, and his successor Henry Johnson, who became Chair in 1967. In 1968, the Transport Act transferred the control of the Sundries and Freightliner divisions from the British Railways Board to National Carriers Ltd and Freightliners Ltd. The Board retained a forty-nine per cent stake in Freightliners Ltd. During the 1970s, the British Railways Board created several subsidiary companies which were to manage some of its undertakings. These included British Transport Hotels Ltd, British Rail Engineering Ltd, and British Rail Hovercraft Ltd. Many of these subsidiary companies were sold under the Conservative governments of the 1980s. There were also two new Chairs during this time. Richard Marsh replaced Henry Johnson in 1971, and Peter Parker became chair in 1976. The privatisation of the British rail network during the 1990s radically changed the role of the British Railways Board. The Transport Act 1993 established Railtrack, a publicly-owned company. The Act transferred the ownership of track and railway infrastructure from the British Railways Board to Railtrack, in addition to the control of signals. Railtrack also replaced the British Railways Board as the body responsible for track investment and maintenance. The British Railways Board remained in existence after these changes, but only performed residual functions relating to pensions, liabilities, and non-operational railway land. The Board also continued to operate the British Transport Police service. The British Railways Board was abolished by the Transport Act 2000, which transferred the remaining functions of the Board to the newly-created Strategic Rail Authority.
- Dick Kerr & Co WorksBiographyBiographyA site on the east side of Strand Road had been intermittently used for railway work since the 1840’s. In 1898 the Electric Railway and Tramway Carriage Works Ltd (ER&TCW) took over the site. This company had strong links with Dick Kerr & Co. The building of Preston Dock in the 1880’s had involved the diversion of the river Ribble and associates of Dick Kerr & Co built the factory building which still stands on the west side of Strand Road in 1900. This site occupies the space between the road and the original river bank. The two sites became a major centre of tram building and electrical equipment manufacture. Dick Kerr & Co took over the West works in 1903 and ER&TCW became the United Electric Car Company in 1905. A major early railway contract was for the electrification of the Liverpool Southport line of the Lancashire and Yorkshire Railway in 1904. The two factories continued in close association until they merged into English Electric in 1918. Military equipment and Seaplanes were built during the First World War and the Dick Kerr & Co Work’s Ladies became a famous football team at that time. Non railway electrical work was gradually transferred to other English Electric factories in the 1920’s. Besides continuing tramway business, major orders for Japan and France helped to establish electric traction industries in those countries, the Tarbes factory continues as a main unit in the Alstom group. A complete electrification scheme was supplied for the Arthur’s Pass line in New Zealand. 1930 saw the transfer of the traction electrical work to Phoenix, Bradford and the closure of West works until the late 30’s. East works continued making buses and trams including a large order for Blackpool. Early diesel electrics became a speciality and shunter contracts with the Willans built 6K engine for the LMS and others were very successful and formed the basis of large orders after the Second World War. In the late 30’s East works open yards and some surrounding properties were built over to form a large aircraft manufacturing site and with West works produced over 3000 Handley Page bombers during the war and just post war, DeHavilland ‘Vampire’ jet fighters. After the war most traction electrical equipment manufacture (but not the offices) was moved from Bradford to East works and ‘K’, ‘RK’ and ‘V’ engine manufacture moved from Willans, Rugby to the West works which also took on diesel and electric locomotive manufacture. Aircraft manufacture continued in both works with large orders for Canberra bombers and Lightning fighters. Final assembly was at Salmesbury and Warton aerodromes. Some locomotive manufacture was subcontracted to Vulcan from the late forties. Notable orders included large Electric locomotives for Spain and the ‘5E’ for South Africa. This locomotive was the basis of subsequent large orders for ‘5E1’ and ‘6E’ equipments produced by or in conjunction with AEI and GEC Traction. The prototype ‘Deltic’ was produced before the takeover of Vulcan and Robert Stephensons in 1955, when all locomotive production was quickly moved to those sites. Most of the diesel engines for the large number of locomotives supplied under the British Rail modernisation plan were made in West works. Aircraft production continued in both works until the formation of the British Aircraft Corporation in the mid-sixties. East works was transferred to BAC and diesel engines moved to Vulcan. The full range of traction equipment manufacture then took over West works and the offices moved in from Bradford in 1967. BAC closed East works in the early nineties and the factory was demolished. Four years after the merger with GEC in 1968 the former English Electric and AEI traction offices were reorganised with commercial and control gear at Trafford Park and machines at Preston. Production locations remained unaltered until the closure of Attercliffe, Sheffield in 1985. Semi-conductor technology gradually changed the product range in the 1980’s with GTO’s and IGBT’s enabling ac induction motors to take over from dc in the 90’s. Over 5000 EE507 dc motors were made for BR Southern region over a period of nearly 50 years. After the merger with Alsthom in 1989 the Trafford Park operation was gradually closed down and all offices and production were moved to Preston in the mid-nineties. Some buildings were demolished and others refurbished. Major orders for ac motor equipments included BR classes 465 and 365, ‘Eurostar’ motors and ‘common’ blocks, Korea, London Underground ‘Jubilee’ and ‘Northern’ lines and Virgin ’Pendolino’ and ‘Voyager’ trains. Most of the motors for these last two were made at Ornans, France after the closure of new motor manufacture in 1999. After 2003 only a small design and drawing facility remained, concentrating on repairs and modifications to existing rolling stock The site remains open as part of Alstom Transport’s Train Life Service business for the manufacture, repair and overhaul of traction control equipment and rotating machines, and as a spare parts distribution centre. BAE systems have occupied some offices on the site since 2006 as tenants of Alstom. Today, the factory is still operating on a reduced scale, only employing about 200.
Creator
Associated people and organisations
Hierarchy browser
- contains 2 partsTOPEE Records of English Electric Company Limited
- contains 25 partsSERIESEE/1 Photograph albums