Creator
- GEC Traction LimitedBiographyBiography
GEC Traction (GECT) was formed in 1972 as part of the GEC Power Engineering Group following earlier amalgamations of the traction divisions of the General Electric Company (GEC), the English Electric Company (EE) and Associated Electrical Industries (AEI). A wholly owned subsidiary company of GEC, the company had offices and works, located at Trafford Park in Manchester, at Strand Road in Preston, and at Attercliffe Common, Sheffield.
The headquarters of GEC Traction was Trafford Park, Manchester (previously the headquarters of English Electric-AEI Traction) with design of rotating machines at Preston and Sheffield, and manufacturing activities for control equipment at Manchester and Preston. GEC Traction designed and manufactured a full range of traction machines and control equipment for electric vehicles, including electric locomotives and multiple unit trains for main-line and mass-transit railway systems (dc up to 3,000 volts, and ac up to 50,000 volts), diesel-electric locomotives and trains, mining and industrial locomotives, tramcars and trolleybuses.
GEC Traction was the leading supplier of traction equipment in the UK and had a wide market around the world, particularly in South Africa, Australasia, Hong Kong, South Korea, South America and Pakistan. In 1979 the Industrial Locomotive Division of the former English Electric which was based at Vulcan Works, Newton-le-Willows was merged into GEC Traction, which later became a separate company, GEC Industrial Locomotives Ltd.
During the late 1980s and 1990s the firm underwent major rationalisation, involving closure of several sites including Attercliffe Common in Sheffield in 1985 and the company’s headquarters at Trafford Park in Manchester in 1998. The company name GEC Traction endured until a merger with the French Alsthom group in 1989, which created GEC Alsthom Traction, which was still a branch of the main company GEC Alsthom.
Scope and Content
The roll contains c 35 acetate drawings of bogie arrangements by GEC Traction and GEC Alstom Transportation Projects Ltd. Drawing number T3104X.
Extent
1 roll
Archival history
This roll of drawings was compiled by GEC Traction Limited
Level of description
FILE
Repository name
National Railway Museum, York
Associated people and organisations
- GEC Alsthom LimitedBiographyBiography
In 1988 a joint-venture was formed between the General Electric Company (GEC) with Compagnie Générale d’Electricité (CGE) that led to the establishment of an Anglo-French company, GEC Alsthom in 1989. This company encompassed the Power Generation and Transmission, Rail Transport (25%) businesses from the constituent companies of GEC and CGE. The GEC Alsthom company headquarters were based at Rugby, Warwickshire and the headquarters for Transport were based at Trafford Park in Manchester.
GEC Alsthom purchased train builder Metro-Cammell based at Washwood Heath, Birmingham from the Laird Group in 1989, bringing into the group a company which had a long association with GEC Traction and its predecessors as a vehicle builder. In 1998 GEC Alsthom was re-formed and became Alstom with Transport / Alstom Transport one of its major divisions.
- GEC Alsthom Traction LimitedBiographyBiography
GEC Alsthom Traction was formed from the merger of GEC and Alcatel-Alsthom (formerly known as Compagnie Générale d’Electricité of France) in 1989, which created a Joint Venture of their Power Engineering businesses (Power Stations, Switchgear and Rail Transport). The UK headquarters of the traction business was based at Trafford Park in Manchester. GEC Alsthom purchased train builder Metro-Cammell based at Washwood Heath, Birmingham from the Laird Group in 1989, bringing into the group a company which had a long association with GEC Traction and its predecessors as a vehicle builder.
GEC Alsthom Traction became part of the Transport Equipment Group (TEG) with the French sites Ornans (motors), Tarbes (control equipment) and Villeurbanne (electronic systems, converters and control equipment), later joined by ACEC Transport (Charleroi). A major project in this period was the design and build of the Trans Manche Super Train (TMST) for London. TMST, later known as Eurostar Class 373, was the first TGV with asynchronous traction drive, all TGVs until later Duplex fleets having DC or synchronous traction drives. It was designed for three voltages 750v DC for the UK Southern Region, 3000v DC for Belgium and 25kV for the tunnel and France, and later for HS1 high speed line from the tunnel to London. SNCF later added 1500v DC to 4 trains to allow the trains to run to the Alps.
In 1993, as part of the rationalisation of the equipment group, it was announced that the headquarters of GEC Alsthom Traction would move to Preston, leaving only Power Module design and manufacture at Manchester, and a project team was set up at Preston for the regeneration of the Preston site, with the eventual closing of all activities at Trafford Park in 1998. At the same time, there was rationalisation of product lines in the equipment group, with inductors and auxiliary converters moving to Preston, traction motor design concentrated at Ornans, switchgear at Tarbes and electronic control systems at Villeurbanne.
GEC Alsthom Traction became Alstom Traction on 22nd June 1998 and the company name survived to 19th August 2008 but was increasingly integrated within the Transport division of Alstom.